Cass County Board of Public Works Porter Township Wastewater Collection and Treatment System Project
Project Introduction -
This project involves the construction of gravity sanitary sewers to serve the developed areas around Birch, Shavehead, Baldwin, Long, Coverdale, and Indiana Lakes as well as the unincorporated town of Union within Porter Township, Cass County Michigan.It also includes the construction of a wastewater treatment plant to be located east of River Road on the south side of US-12 with discharge to the St. Joseph River.
The system includes 97,020 linear feet of eight-inch sanitary sewer; 34,605 linear feet of 10-inch sanitary sewer; 1,205 linear feet of 12-inch sanitary sewer; 30 linear feet of 15-inch sanitary sewer; 7,455 linear feet of two-inch force main; 2,885 linear feet of 2.5-inch force main, 15,885 linear feet of four-inch force main; 24,875 linear feet of six-inch force main; 24,805 linear feet of eight-inch force main; 19,360 linear feet of 12-inch force main; 16 lift stations; 14 grinder stations; five in-place generators; and one bioxide feed system.
The new treatment plant is a 400,000 gallon-per-day sequencing batch reactor with a tertiary filter and ultraviolet disinfection system serving approximately 1,400 customers.

Sanitary Sewer Service Location Form
Areas Available for Connections
Permits have not been issued on any roads other than those noted.
The date listed is the end of your 90 days.
ORDERS TO CONNECT HAVE BEEN SENT TO RESIDENTS ON THE FOLLOWING STREETS:
U.S. 12 Nov 3, 2005
Vera Drive Nov 3, 2005
Mason St Nov 3. 2005
Baldwin Prairie Rd Nov 3, 2005
Hazel Road Nov 3, 2005
Union Road Nov 3, 2005
Michigan Avenue Nov 3, 2005
Sunset Dr (from Us 12 to 69799) Nov 3, 2005
Pleasant Drive Nov 8, 2005
Oak Street Nov 8, 2005
High Street Nov 8, 2005
N Terrace Nov 8, 2005
Michigan Avenue (69800 thru 70171) Dec 24, 2005
Ridgeway St Dec 24, 2005
Beechwood Dr Feb 8, 2006
Sunset Dr (from 70171 thru 70400) Feb 8, 2006
Terrie Shores (from 13514 thru 13565) Feb 8, 2006
Dolans Ave Jan 28, 2006
Joseph Rd 15250 thru 66067 Jan 28, 2006
Emma Lane May 22, 2006
Lakeshore Dr (Shavehead) May 22, 2006
Joseph Rd (66067 to the end) May 22, 2006
Lakeview Dr (Shavehead) June 2, 2006
Clair Dr Feb 16, 2006
Dawn Dr Feb 16, 2006
Lake St Feb 16,2006
Arbola Dr Feb 16, 2006
Lake Trail Feb 16, 2006
Shady Lane (a portion) Feb 16, 2006
Lakeview Dr Feb 16, 2006
Indiana Lake Dr (2 residents) Feb 16, 2006
Wayne St April 13, 2006
Hilltop Dr April 31, 2006
Indiana Lake Dr July 21, 2006
Hollywood Shores (a portion) July 21, 2006
Lake St August 15, 2006
S Baldwin Lake Dr August 15, 2006
Terrie Shores (13565 to the end) September 19, 2006
Treasure Island Dr September 19, 2006
Hartshorn Dr September 19, 2006
Hollywood Shores (balance) October 26, 2006
Hidden Lane October 26, 2006
North Dr October 26, 2006
South Dr October 26, 2006
Center St October 26, 2006
Porter Township Area Utility Authority Sewer Connection Procedure
Residents will be notified 90 days before it is time to hook up to the sewer. At that time permits will be available at the Township Administration building. The cost for the permit is $50.00 and this includes the cost of a final inspection. The permit forms must be filled out including the installation drawing for the final inspection.The permit applications are to be signed by the contractor or the homeowner. After the permit is issued, the connection to the sewer can be installed. The entire length of the connection cannot be backfilled until after the inspection.
Pipe Materials and Construction Methods
Pipe materials shall be Schedule 40 PVC or equivalent with glued or premium joints. Primer shall be purple dye tinted so that it is visible during inspection. All materials and installation shall be in accordance with applicable plumbing codes. Pipe must be laid from the house to the line with a fall of 1/8-inch per foot for 4-inch pipe. Minimum depth of bury is 18- inches.
Connection to the Sewer Tap
The connection to the 6-inch public sewer tap shall be made with flexible rubber connectors with stainless steel bands. Fernco or equal (watertight) if 6-inch pipe is used it shall be a 6" by 6" connector and if 4-inch pipes are used it shall be a 6" by 4" connector.
Cleanouts
One cleanout shall be installed at the connection of the private sewer to the public sewer. This cleanout shall be terminated 2-inches below the grade with a watertight plug. Additional cleanouts shall be installed, one at the house connection and then one for every 100-feet of service length and at every change of direction. All cleanouts shall be permanently marked by a 1/2 x 18-inch rebar taped to the cleanout and set 2-inches below the grade.
Sewage Ejector Pumps
An electrical permit is required for a sewage ejector. The cost of the permit is $50.00. It is contingent on wether there will be a 110V or 220V circuit and wether or not there is an alarm installed. If an additional inspection fee is required it will be $45.00 for each inspector visit. The ejector pumps must be sized for the needed flow and head conditions. The maximum dose per cycle of the pump shall be 100 gallons, minimum of 50 gallons. The sewage ejector shall be installed in a tank designed for intended use. The tank must provide a maximum of 100-gallons per dose. The forcemain from the sewage ejector shall be a minimum of 2-inch diameter unless an approved grinder pump is used. The forcemain shall be terminated into the side of the cleanout at the public sewer no less than 6-inches above the invert with a watertight fitting. Access at the grade to the ejector or grinder pump is recommended.
Septic Tanks
All septic tanks must be pumped by a licensed waste hauler and filled. The plumbing inspector must see that they are disabled and filled, so do not cover until they have been inspected.
This is a sanitary sewer only. No eaves or sump pumps shall be hooked to the system.
Billing for Service
Once there has been a final inspection, the billing for the use of the sewer will begin the following month or at the end of 90 days whatever comes first. The monthly usage fee is $40.00
|
Contact Information
- On Site Representative
Dave Mitchell Cell Phone: (269) 449-6845
- Project Manager for Collection System
Thomas A. Deneau, P.E. Toll-Free: (877) 927-0109 Office Phone: (269) 927-0100 Email: tdeneau@wightman-assoc.com
- Project Manager for Wastewater Treatment
Matt A. Davis, P.E. Office Phone: (269) 927-0200 Ext 309 Email: mdavis@wightman-assoc.com
- Cass County Michigan Web Page
Web Link: Cass County Web Page
- Easement Questions
Attorney Roosevelt Thomas Office Phone: (269) 782-5144 Email: laurielowe@email.com
|